This project in Stowmarket involved constructing a large concrete pad designed for long-term durability and efficient water management. The area was heavily overgrown before work began, so the first stage was a full site clearance to create a safe and workable space.


Once cleared, the ground was excavated and carefully levelled. Timber shuttering was installed to shape the pad, and drainage channels were positioned to ensure reliable water runoff and prevent pooling.

With the foundations ready, the concrete was poured in multiple sections to achieve a smooth, even finish. The integrated drainage system was set perfectly into the slab to provide long-term functionality.
The final result is a strong, low-maintenance concrete pad suitable for a range of uses, including storage, parking, workshops, or garden structures. Its clean finish and drainage design ensure it will withstand heavy use and all weather conditions.